Sectors: water supply first
CEACM's strongest sector thread is water and sanitation infrastructure. The director's experience includes emergency water supply, transmission pipelines, borehole connections, pumping systems, storage tanks, bulk metering, sewerage networks, treatment works, pumping station rehabilitation and dam rehabilitation. That gives CEACM a practical understanding of the technical-commercial interface that often drives variations, delay events, payment disputes and final account issues.
Why water projects are commercially demanding
Existing assets, incomplete records, live operations.
Water works often involve existing assets, incomplete records, stakeholder interfaces, procurement dependencies, live operations and urgent delivery pressure. CEACM's role is to convert these realities into clear records, proper notices, fair valuation, defensible claims and practical commercial decisions. Typical triggers include design changes, delayed information, non-conforming site conditions, remeasurement, omitted works, procurement delays, payment issues and time-related cost effects.
Sectors
Six capability sectors.
Water supply
Tanks, mains, boreholes and pumping
Emergency works, rehabilitation, pipeline interfaces, bulk metering, electrical coordination and operational equipment.
Experience: WASIB, The Gambia; Nairobi Water Distribution Network, Lots 1 and 2.
Sanitation
Sewers and treatment works
Main sewers, pre-treatment plants, pumping stations, FIDIC administration, IPCs and claims.
Experience: Kampala Sanitation Programme Phase II, Uganda.
Civil works
Roads, drainage and siteworks
Urban infrastructure, access roads, drainage, footpaths, valuation, variation and claim support.
Experience: Nairobi County Settlements Infrastructure and EASA road rehabilitation.
Major infrastructure
Dam and specialist works
Complex contractor-side contract management, claims, close-out and technical-commercial interfaces.
Experience: Kariba Dam Rehabilitation Project, Zambia (plunge pool reshaping, cofferdam works, drill and blast excavation and instrumentation interfaces).
Buildings
Residential, commercial and institutional
Bills of Quantities, cost planning, tender analysis, valuations, final accounts and fit-out works.
Commercial advisory
Risk, claims and strategy
Clause-based options, correspondence, negotiation briefs, dispute avoidance and management reporting.
Client fit
Where CEACM can add value quickly.
| Client or project environment | How CEACM supports |
|---|---|
| Contractors and joint ventures | Claims, variations, payment applications, records, subcontract administration, contractual letters, commercial strategy and final account support. |
| Employers and developers | Cost planning, procurement support, valuation review, commercial reporting, claims review, contract administration assistance and cost governance. |
| Engineers and project managers | Technical-commercial interface support, instruction tracking, valuation support, payment assessment and structured decision records. |
| Donor-funded or audit-sensitive projects | Documentation standards, compliance-minded reporting, evidence mapping, cost verification and transparent commercial records. |
Questions
Frequently asked questions
Does CEACM work outside the water sector?
Yes. The director's experience includes urban roads, drainage and access roads, and CEACM also supports building projects. Water and sanitation are where the experience is deepest.
Which funders and contract forms does CEACM have experience with?
The director's referenced experience includes AFD Harmonised FIDIC 2010, a FIDIC Red Book contract with Government of Uganda and KfW funding, and the European Union form of contract. See Experience for the project list and its note.
Can CEACM support a project in a country where it has not worked before?
Services may be performed remotely or within the countries required by project needs. Referenced experience is in Kenya, Uganda, Zambia and The Gambia. Local law and regulatory requirements are for local advocates.
Contact
Tell us about your contract.
Tell us about the contract, the stage it has reached and the decision you need to make. We reply by email.